{"id":228969,"date":"2025-09-25T19:12:45","date_gmt":"2025-09-25T13:42:45","guid":{"rendered":"https:\/\/www.oliveboard.in\/blog\/?p=228969"},"modified":"2025-09-25T19:12:51","modified_gmt":"2025-09-25T13:42:51","slug":"kusum-scheme","status":"publish","type":"post","link":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/","title":{"rendered":"KUSUM Scheme Empowering Farmers Through Solar Energy"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_77 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of content<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#Why_was_the_KUSUM_Scheme_Launched\" >Why was the KUSUM Scheme Launched?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#What_are_the_Main_Objectives_of_the_KUSUM_Scheme\" >What are the Main Objectives of the KUSUM Scheme?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#What_are_the_Components_of_the_KUSUM_Scheme\" >What are the Components of the KUSUM Scheme?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#Who_is_Eligible_for_the_KUSUM_Scheme\" >Who is Eligible for the KUSUM Scheme?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#What_are_the_Financial_and_Technical_Support_Provisions\" >What are the Financial and Technical Support Provisions?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#What_are_the_Benefits_of_the_KUSUM_Scheme\" >What are the Benefits of the KUSUM Scheme?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#What_are_the_Achievements_So_Far\" >What are the Achievements So Far?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#What_are_the_Challenges_Faced_by_the_KUSUM_Scheme\" >What are the Challenges Faced by the KUSUM Scheme?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#Key_Takeaways_from_the_KUSUM_Scheme\" >Key Takeaways from the KUSUM Scheme<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#Questions_Based_on_the_KUSUM_Scheme\" >Questions Based on the KUSUM Scheme<\/a><\/li><\/ul><\/nav><\/div>\n\n<p>The <strong>Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabhiyan,<\/strong> also termed as PM KUSUM Scheme. This scheme is an ambitious initiative launched in <strong>March 2019<\/strong> by the <strong>Ministry of New and Renewable Energy (MNRE)<\/strong>. The primary aim of this central sector scheme is to promote the use of solar energy in the agriculture sector while simultaneously enhancing farmers\u2019 income and ensuring energy security.<\/p>\n\n\n\n<p>The scheme seeks to provide financial support for the installation of solar pumps, grid-connected solar plants, and the solarization of existing irrigation pumps, thereby reducing the dependence on diesel-powered irrigation systems and encouraging renewable energy use in agriculture.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-why-was-the-kusum-scheme-launched\"><span class=\"ez-toc-section\" id=\"Why_was_the_KUSUM_Scheme_Launched\"><\/span>Why was the KUSUM Scheme Launched?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The PM-KUSUM Scheme was introduced to address multiple challenges in Indian agriculture:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Energy Security for Farmers:<\/strong> Many rural areas face irregular electricity supply, affecting irrigation. Solar-powered solutions provide a stable energy source.<\/li>\n\n\n\n<li><strong>Income Enhancement:<\/strong> Farmers can sell surplus solar energy to local DISCOMs, creating an additional source of income.<\/li>\n\n\n\n<li><strong>Environmental Sustainability:<\/strong> By reducing diesel usage and promoting renewable energy, the scheme reduces carbon emissions.<\/li>\n\n\n\n<li><strong>Rural Electrification:<\/strong> Promotes decentralized solar power generation, improving electricity access in rural regions.<\/li>\n\n\n\n<li><strong>Optimal Land Use:<\/strong> Encourages farmers to utilize barren or uncultivated land for solar power generation.<\/li>\n<\/ol>\n\n\n\n<p>The scheme aligns with India\u2019s <strong>commitment to increase the share of non-fossil fuel electricity to 40% by 2030<\/strong>, as part of its <strong>Intended Nationally Determined Contributions (INDCs)<\/strong>.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.oliveboard.in\/upcoming-government-exams\/?ref=contac-aib\" target=\"_blank\" rel=\"noreferrer noopener\">Check Upcoming Govt Exams<\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-are-the-main-objectives-of-the-kusum-scheme\"><span class=\"ez-toc-section\" id=\"What_are_the_Main_Objectives_of_the_KUSUM_Scheme\"><\/span>What are the Main Objectives of the KUSUM Scheme?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The KUSUM Scheme has several core objectives:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Provide <strong>energy and water security<\/strong> to farmers.<\/li>\n\n\n\n<li>Replace <strong>diesel-powered irrigation<\/strong> with solar-powered solutions.<\/li>\n\n\n\n<li>Reduce the <strong>financial burden on states<\/strong> for agricultural electricity subsidies.<\/li>\n\n\n\n<li>Promote <strong>renewable energy<\/strong> and contribute to India\u2019s solar power goals.<\/li>\n\n\n\n<li>Allow farmers to <strong>sell surplus solar power<\/strong> to DISCOMs, enhancing income.<\/li>\n\n\n\n<li>Encourage sustainable farming practices and <strong>eco-friendly irrigation<\/strong>.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-are-the-components-of-the-kusum-scheme\"><span class=\"ez-toc-section\" id=\"What_are_the_Components_of_the_KUSUM_Scheme\"><\/span>What are the Components of the KUSUM Scheme?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The KUSUM Scheme is divided into three main components, each catering to different solar energy solutions in agriculture.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Component<\/strong><\/td><td><strong>Details<\/strong><\/td><td><strong>Support<\/strong><\/td><\/tr><tr><td><strong>A. Ground-Mounted Solar Power Plants<\/strong><\/td><td>&#8211; Decentralized, grid-connected solar plants on farmers\u2019 land <br>&#8211; Can be installed on cultivable land without affecting crops <br>&#8211; Power purchased by DISCOMs at FiT (SERC) <br>&#8211; PBI: 40 paise\/kWh or Rs. 6.60 lakh\/MW\/year (5 yrs)<\/td><td>500 kW \u2013 2 MW per plant Total target: 10,000 MW<\/td><\/tr><tr><td><strong>B. Standalone Solar Agriculture Pumps<\/strong><\/td><td>&#8211; For off-grid irrigation areas <br>&#8211; Reduces diesel usage <br>&#8211; Cost-sharing: Centre 30%, State 30%, Farmer 40% <br>&#8211; Bank loans up to 30% <br>&#8211; NER\/Hilly\/Islands: 50% subsidy, 20% farmer contribution<\/td><td>14\u201320 lakh pumps 7.5 HP (up to 15 HP in some regions)<\/td><\/tr><tr><td><strong>C. Solarization of Grid-Connected Pumps<\/strong><\/td><td>&#8211; Solarize existing grid-connected pumps <br>&#8211; IPS: Use for irrigation &amp; sell surplus <br>&#8211; FLS: Solarize entire feeders <br>&#8211; CFA 30% of cost <br>&#8211; Promotes energy efficiency &amp; reduces diesel use<\/td><td>15\u201335 lakh pumps Up to Rs. 1.05 Cr\/MW (General States) Rs. 1.75 Cr\/MW (NER\/Hilly regions)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"586\" height=\"583\" src=\"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.png\" alt=\"PM Kusum Scheme\" class=\"wp-image-228994\" style=\"width:548px;height:auto\"\/><\/figure><\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-who-is-eligible-for-the-kusum-scheme\"><span class=\"ez-toc-section\" id=\"Who_is_Eligible_for_the_KUSUM_Scheme\"><\/span>Who is Eligible for the KUSUM Scheme?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The scheme is inclusive and caters to a variety of stakeholders in agriculture:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Individual farmers<\/li>\n\n\n\n<li>Groups of farmers<\/li>\n\n\n\n<li>Farmer Producer Organizations (FPOs)<\/li>\n\n\n\n<li>Panchayats<\/li>\n\n\n\n<li>Co-operatives<\/li>\n\n\n\n<li>Water User Associations<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-are-the-financial-and-technical-support-provisions\"><span class=\"ez-toc-section\" id=\"What_are_the_Financial_and_Technical_Support_Provisions\"><\/span>What are the Financial and Technical Support Provisions?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The PM-KUSUM Scheme provides robust <strong>financial support<\/strong>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Subsidies:<\/strong> 30\u201360% of total installation costs depending on the component and region.<\/li>\n\n\n\n<li><strong>Loans:<\/strong> Farmers can access loans covering up to 30% of the project cost.<\/li>\n\n\n\n<li><strong>Incentives:<\/strong> DISCOMs pay a feed-in tariff or PBI to farmers for surplus power.<\/li>\n<\/ul>\n\n\n\n<p>Technical support includes assistance from state nodal agencies, training for operation and maintenance, and proper integration with the power grid.<\/p>\n\n\n\n<p><strong>Get ready to crack government job exams with leading educators<\/strong><\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.oliveboard.in\/courses\/?ref=contac-aib\" target=\"_blank\" rel=\"noreferrer noopener\">Enroll in Online Live Classes Today!<\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-are-the-benefits-of-the-kusum-scheme\"><span class=\"ez-toc-section\" id=\"What_are_the_Benefits_of_the_KUSUM_Scheme\"><\/span>What are the Benefits of the KUSUM Scheme?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The details of the benefits of the KUSUM Scheme are as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Benefits for Farmers:<\/strong> Less spending on diesel, steady income from selling surplus solar energy for 25 years, improved irrigation and crop yield, and use of barren land for solar plants.<\/li>\n\n\n\n<li><strong>Environmental Benefits:<\/strong> Reduced carbon emissions and air pollution, promotion of eco-friendly farming, and contribution to India\u2019s renewable energy targets.<\/li>\n\n\n\n<li><strong>Benefits for the Economy:<\/strong> Lower subsidy burden on state electricity boards, promotion of rural electrification and decentralized power, and creation of jobs in installation, operation, and maintenance.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-are-the-achievements-so-far\"><span class=\"ez-toc-section\" id=\"What_are_the_Achievements_So_Far\"><\/span>What are the Achievements So Far?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>As of 30th June 2024:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Around <strong>4.1 lakh farmers<\/strong> have benefited from the scheme.<\/li>\n\n\n\n<li>Significant progress in <strong>solarizing agriculture pumps<\/strong> and installing off-grid solar pumps.<\/li>\n\n\n\n<li>Steady contribution to India\u2019s <strong>renewable energy capacity goals<\/strong>, aiming for <strong>34,800 MW by March 2026<\/strong>.<\/li>\n<\/ul>\n\n\n\n<p>The scheme has proven to be a <strong>transformative step<\/strong> for sustainable agriculture and renewable energy adoption in India.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-are-the-challenges-faced-by-the-kusum-scheme\"><span class=\"ez-toc-section\" id=\"What_are_the_Challenges_Faced_by_the_KUSUM_Scheme\"><\/span>What are the Challenges Faced by the KUSUM Scheme?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>While the scheme offers multiple benefits, several challenges remain:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Financial Constraints:<\/strong> High initial costs and limited access to bank loans.<\/li>\n\n\n\n<li><strong>Logistics Issues:<\/strong> Availability of solar pumps and components in domestic markets.<\/li>\n\n\n\n<li><strong>Depleting Water Tables:<\/strong> Over-irrigation may occur due to low-cost energy availability.<\/li>\n\n\n\n<li><strong>Regulatory Barriers:<\/strong> Restrictions on grid connectivity and feed-in tariffs.<\/li>\n\n\n\n<li><strong>Technical Challenges:<\/strong> Integration of decentralized solar plants into the grid may pose stability issues.<\/li>\n<\/ol>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.oliveboard.in\/test-series\/?ref=contac-ai\" target=\"_blank\" rel=\"noreferrer noopener\">Attempt a free mock test Now!<\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-key-takeaways-from-the-kusum-scheme\"><span class=\"ez-toc-section\" id=\"Key_Takeaways_from_the_KUSUM_Scheme\"><\/span>Key Takeaways from the KUSUM Scheme<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Feature<\/strong><\/td><td><strong>Details<\/strong><\/td><\/tr><tr><td>Launch Year<\/td><td>2019<\/td><\/tr><tr><td>Nodal Ministry<\/td><td>Ministry of New and Renewable Energy (MNRE)<\/td><\/tr><tr><td>Total Target<\/td><td>34,800 MW solar capacity by 2026<\/td><\/tr><tr><td>Total Investment<\/td><td>Rs. 34,422 crore<\/td><\/tr><tr><td>Components<\/td><td>Component A: Grid-connected solar plants, Component B: Standalone solar pumps, Component C: Solarization of grid pumps<\/td><\/tr><tr><td>Subsidy<\/td><td>30\u201360% depending on component and region<\/td><\/tr><tr><td>Eligible Entities<\/td><td>Individual farmers, groups, FPOs, Panchayats, Co-operatives, Water User Associations<\/td><\/tr><tr><td>Benefits<\/td><td>Reduced diesel use, increased farmer income, renewable energy adoption, environmental sustainability<\/td><\/tr><tr><td>Challenges<\/td><td>Financial constraints, logistics, water table issues, regulatory barriers, grid stability<\/td><\/tr><tr><td>Achievements<\/td><td>4.1 lakh farmers benefited, progress toward 34,800 MW solar capacity<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Also Read:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Government Schemes<\/strong><\/td><td><strong>Government Schemes<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/www.oliveboard.in\/blog\/one-nation-one-subscription-onos\/?ref=contac-aib\" target=\"_blank\" rel=\"noreferrer noopener\">One Nation One Subscription<\/a><\/td><td><a href=\"https:\/\/www.oliveboard.in\/blog\/ayushman-bharat-scheme\/?ref=contac-aib\" target=\"_blank\" rel=\"noreferrer noopener\">Ayushman Bharat Scheme<\/a><\/td><\/tr><tr><td><a href=\"https:\/\/www.oliveboard.in\/blog\/aatmanirbharta-in-pulses\/?ref=contac-aib\" target=\"_blank\" rel=\"noreferrer noopener\">Aatmanirbharta in Pulses<\/a><\/td><td><a href=\"https:\/\/www.oliveboard.in\/blog\/national-broadband-mission-2-0\/?ref=contac-aib\" target=\"_blank\" rel=\"noreferrer noopener\">National Broadband Mission 2.0<\/a><\/td><\/tr><tr><td><a href=\"https:\/\/www.oliveboard.in\/blog\/pm-dhan-dhaanya-krishi-yojana-pmddky\/?ref=contac-aib\" target=\"_blank\" rel=\"noreferrer noopener\">Pradhan Mantri Dhan Krishi Yojana<\/a><\/td><td><a href=\"https:\/\/www.oliveboard.in\/blog\/stand-up-india-scheme\/?ref=contac-aib\" target=\"_blank\" rel=\"noreferrer noopener\">Stand Up India Scheme<\/a><\/td><\/tr><tr><td><a href=\"https:\/\/www.oliveboard.in\/blog\/gst-2-0\/?ref=contc-aib\" target=\"_blank\" rel=\"noreferrer noopener\">All About GST 2.0<\/a><\/td><td><a href=\"https:\/\/www.oliveboard.in\/blog\/green-credit-program-earn-rewards-for-a-greener-world\/?ref=contac-aib\" target=\"_blank\" rel=\"noreferrer noopener\">National Green Credit Programme<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-questions-based-on-the-kusum-scheme\"><span class=\"ez-toc-section\" id=\"Questions_Based_on_the_KUSUM_Scheme\"><\/span>Questions Based on the KUSUM Scheme<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>What does KUSUM stand for?<\/strong><br>a) Kisan Urja Suraksha evam Utthan Mahabhiyan<br>b) Kisan Urja Samridhi evam Utthan Mahabhiyan<br>c) Krishi Urja Suraksha evam Utthan Mission<br>d) Kisan Urja Suraksha Mission<br>e) None of the above<br><strong>Answer:<\/strong> a<\/li>\n\n\n\n<li><strong>In which year was the PM-KUSUM Scheme launched?<\/strong><br>a) 2015<br>b) 2017<br>c) 2019<br>d) 2020<br>e) 2021<br><strong>Answer:<\/strong> c<\/li>\n\n\n\n<li><strong>Which ministry is responsible for PM-KUSUM?<\/strong><br>a) Ministry of Agriculture<br>b) Ministry of Power<br>c) Ministry of New and Renewable Energy<br>d) Ministry of Rural Development<br>e) Ministry of Environment<br><strong>Answer:<\/strong> c<\/li>\n\n\n\n<li><strong>What is the total solar capacity target under PM-KUSUM by 2026?<\/strong><br>a) 10,000 MW<br>b) 20,000 MW<br>c) 34,800 MW<br>d) 50,000 MW<br>e) 25,000 MW<br><strong>Answer:<\/strong> c<\/li>\n\n\n\n<li><strong>Component B of PM-KUSUM relates to:<\/strong><br>a) Grid-connected solar plants<br>b) Standalone solar agriculture pumps<br>c) Solarization of grid pumps<br>d) Solar plants on rooftops<br>e) Solar water treatment<br><strong>Answer:<\/strong> b<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.oliveboard.in\/previous-year-papers\/?ref=contac-ai\" target=\"_blank\" rel=\"noreferrer noopener\">Solve Free Previous Year Papers Today<\/a><\/div>\n<\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>What percentage of subsidy does the Central Government provide for solar pumps?<\/strong><br>a) 10\u201320%<br>b) 20\u201330%<br>c) 30\u201350%<br>d) 50\u201370%<br>e) 60\u201380%<br><strong>Answer:<\/strong> c<\/li>\n\n\n\n<li><strong>Which entity buys surplus power from farmers under PM-KUSUM?<\/strong><br>a) MNRE<br>b) State DISCOMs<br>c) NABARD<br>d) RBI<br>e) Ministry of Agriculture<br><strong>Answer:<\/strong> b<\/li>\n\n\n\n<li><strong>Which areas get 50% subsidy for solar pumps?<\/strong><br>a) Plains<br>b) Urban areas<br>c) NER, hilly regions, islands<br>d) Coastal regions only<br>e) Western states only<br><strong>Answer:<\/strong> c<\/li>\n\n\n\n<li><strong>What is the maximum capacity of solar power plants under Component A?<\/strong><br>a) 500 kW<br>b) 1 MW<br>c) 2 MW<br>d) 5 MW<br>e) 10 MW<br><strong>Answer:<\/strong> c<\/li>\n\n\n\n<li><strong>Which organization sets the feed-in tariff for solar energy under PM-KUSUM?<\/strong><br>a) MNRE<br>b) CERC<br>c) SERC<br>d) NABARD<br>e) REC<br><strong>Answer:<\/strong> c<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<ul class=\"wp-block-latest-posts__list is-grid columns-3 wp-block-latest-posts\"><li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/www.oliveboard.in\/blog\/how-to-clear-multiple-government-exams\/\">How Some Aspirants Clear Multiple Government Exams: Strategy, Discipline &amp; Exam Psychology<\/a><\/li>\n<li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/www.oliveboard.in\/blog\/crop-diversification-program\/\">Crop Diversification Program, Transforming Indian Agriculture<\/a><\/li>\n<li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/www.oliveboard.in\/blog\/important-government-schemes-nabard-grade-a\/\">Government Schemes for NABARD Grade A 2026<\/a><\/li>\n<li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/www.oliveboard.in\/blog\/national-dairy-plan-phase-1-phase-2\/\">National Dairy Plan Phase 1 and Phase 2, Boosting India\u2019s Dairy Sector<\/a><\/li>\n<li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/www.oliveboard.in\/blog\/mera-gaon-mera-gaurav-scheme\/\">Mera Gaon Mera Gaurav Scheme, Bridging Lab to Land<\/a><\/li>\n<li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/www.oliveboard.in\/blog\/farmers-first-initiative\/\">Farmers First Initiative, Empowering Farmers Through Innovation<\/a><\/li>\n<\/ul>\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabhiyan, also termed as PM KUSUM Scheme. This scheme is an ambitious<\/p>\n","protected":false},"author":58,"featured_media":229384,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14458,11544],"tags":[],"class_list":["post-228969","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government-scheme","category-static-gk","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-50"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.6 (Yoast SEO v26.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>KUSUM Scheme Empowering Farmers Through Solar Energy<\/title>\n<meta name=\"description\" content=\"Explore the PM KUSUM Scheme launched to enhance farmers&#039; income through solar energy and reduce reliance on diesel irrigation systems.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KUSUM Scheme Empowering Farmers Through Solar Energy\" \/>\n<meta property=\"og:description\" content=\"The Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabhiyan, also termed as PM KUSUM Scheme. This scheme is an ambitious initiative launched in March\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/\" \/>\n<meta property=\"og:site_name\" content=\"Oliveboard\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Oliveboard\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-25T13:42:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-25T13:42:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"730\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"AditiOB\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Oliveboard\" \/>\n<meta name=\"twitter:site\" content=\"@Oliveboard\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"AditiOB\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/\"},\"author\":{\"name\":\"AditiOB\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#\/schema\/person\/0cbc4ac8555ced346681804861de062c\"},\"headline\":\"KUSUM Scheme Empowering Farmers Through Solar Energy\",\"datePublished\":\"2025-09-25T13:42:45+00:00\",\"dateModified\":\"2025-09-25T13:42:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/\"},\"wordCount\":1193,\"publisher\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp\",\"articleSection\":[\"Government Scheme\",\"Static GK\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/\",\"url\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/\",\"name\":\"KUSUM Scheme Empowering Farmers Through Solar Energy\",\"isPartOf\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp\",\"datePublished\":\"2025-09-25T13:42:45+00:00\",\"dateModified\":\"2025-09-25T13:42:51+00:00\",\"description\":\"Explore the PM KUSUM Scheme launched to enhance farmers' income through solar energy and reduce reliance on diesel irrigation systems.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#primaryimage\",\"url\":\"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp\",\"contentUrl\":\"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp\",\"width\":730,\"height\":480},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.oliveboard.in\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Government Scheme\",\"item\":\"https:\/\/www.oliveboard.in\/blog\/category\/government-scheme\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"KUSUM Scheme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#website\",\"url\":\"https:\/\/www.oliveboard.in\/blog\/\",\"name\":\"Oliveboard\",\"description\":\"Free Govt. Exam Alerts &amp; Resources\",\"publisher\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.oliveboard.in\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#organization\",\"name\":\"Oliveboard\",\"url\":\"https:\/\/www.oliveboard.in\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2021\/11\/logo.png\",\"contentUrl\":\"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2021\/11\/logo.png\",\"width\":150,\"height\":40,\"caption\":\"Oliveboard\"},\"image\":{\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Oliveboard\",\"https:\/\/x.com\/Oliveboard\",\"https:\/\/www.instagram.com\/oliveboard.in\/\",\"https:\/\/www.youtube.com\/channel\/UCRvrHAyNdOMI_JBkE2pjZtw?sub_confirmation=1\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#\/schema\/person\/0cbc4ac8555ced346681804861de062c\",\"name\":\"AditiOB\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.oliveboard.in\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d1e881725409eac0bd9260c141e2a522d2a6a86c9dfeba73e8523e493f39e045?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d1e881725409eac0bd9260c141e2a522d2a6a86c9dfeba73e8523e493f39e045?s=96&d=mm&r=g\",\"caption\":\"AditiOB\"},\"description\":\"Hi, I\u2019m Aditi. I work as a Content Writer at Oliveboard, where I have been simplifying exam-related content for the past 4 years. I create clear and easy-to-understand guides for JAIIB, CAIIB, and UGC exams. My work includes breaking down notifications, admit cards, and exam updates, as well as preparing study plans and subject-wise strategies. My goal is to support working professionals in managing their exam preparation alongside a full-time job and to help them achieve career growth.\",\"sameAs\":[\"www.linkedin.com\/in\/aditi-chakraborty-131b3b379\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"KUSUM Scheme Empowering Farmers Through Solar Energy","description":"Explore the PM KUSUM Scheme launched to enhance farmers' income through solar energy and reduce reliance on diesel irrigation systems.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/","og_locale":"en_US","og_type":"article","og_title":"KUSUM Scheme Empowering Farmers Through Solar Energy","og_description":"The Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabhiyan, also termed as PM KUSUM Scheme. This scheme is an ambitious initiative launched in March","og_url":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/","og_site_name":"Oliveboard","article_publisher":"https:\/\/www.facebook.com\/Oliveboard","article_published_time":"2025-09-25T13:42:45+00:00","article_modified_time":"2025-09-25T13:42:51+00:00","og_image":[{"width":730,"height":480,"url":"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp","type":"image\/webp"}],"author":"AditiOB","twitter_card":"summary_large_image","twitter_creator":"@Oliveboard","twitter_site":"@Oliveboard","twitter_misc":{"Written by":"AditiOB","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#article","isPartOf":{"@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/"},"author":{"name":"AditiOB","@id":"https:\/\/www.oliveboard.in\/blog\/#\/schema\/person\/0cbc4ac8555ced346681804861de062c"},"headline":"KUSUM Scheme Empowering Farmers Through Solar Energy","datePublished":"2025-09-25T13:42:45+00:00","dateModified":"2025-09-25T13:42:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/"},"wordCount":1193,"publisher":{"@id":"https:\/\/www.oliveboard.in\/blog\/#organization"},"image":{"@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#primaryimage"},"thumbnailUrl":"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp","articleSection":["Government Scheme","Static GK"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/","url":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/","name":"KUSUM Scheme Empowering Farmers Through Solar Energy","isPartOf":{"@id":"https:\/\/www.oliveboard.in\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#primaryimage"},"image":{"@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#primaryimage"},"thumbnailUrl":"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp","datePublished":"2025-09-25T13:42:45+00:00","dateModified":"2025-09-25T13:42:51+00:00","description":"Explore the PM KUSUM Scheme launched to enhance farmers' income through solar energy and reduce reliance on diesel irrigation systems.","breadcrumb":{"@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#primaryimage","url":"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp","contentUrl":"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2025\/09\/pm-kusum-scheme-1.webp","width":730,"height":480},{"@type":"BreadcrumbList","@id":"https:\/\/www.oliveboard.in\/blog\/kusum-scheme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.oliveboard.in\/blog\/"},{"@type":"ListItem","position":2,"name":"Government Scheme","item":"https:\/\/www.oliveboard.in\/blog\/category\/government-scheme\/"},{"@type":"ListItem","position":3,"name":"KUSUM Scheme"}]},{"@type":"WebSite","@id":"https:\/\/www.oliveboard.in\/blog\/#website","url":"https:\/\/www.oliveboard.in\/blog\/","name":"Oliveboard","description":"Free Govt. Exam Alerts &amp; Resources","publisher":{"@id":"https:\/\/www.oliveboard.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.oliveboard.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.oliveboard.in\/blog\/#organization","name":"Oliveboard","url":"https:\/\/www.oliveboard.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.oliveboard.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2021\/11\/logo.png","contentUrl":"https:\/\/www.oliveboard.in\/blog\/wp-content\/uploads\/2021\/11\/logo.png","width":150,"height":40,"caption":"Oliveboard"},"image":{"@id":"https:\/\/www.oliveboard.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Oliveboard","https:\/\/x.com\/Oliveboard","https:\/\/www.instagram.com\/oliveboard.in\/","https:\/\/www.youtube.com\/channel\/UCRvrHAyNdOMI_JBkE2pjZtw?sub_confirmation=1"]},{"@type":"Person","@id":"https:\/\/www.oliveboard.in\/blog\/#\/schema\/person\/0cbc4ac8555ced346681804861de062c","name":"AditiOB","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.oliveboard.in\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d1e881725409eac0bd9260c141e2a522d2a6a86c9dfeba73e8523e493f39e045?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d1e881725409eac0bd9260c141e2a522d2a6a86c9dfeba73e8523e493f39e045?s=96&d=mm&r=g","caption":"AditiOB"},"description":"Hi, I\u2019m Aditi. I work as a Content Writer at Oliveboard, where I have been simplifying exam-related content for the past 4 years. I create clear and easy-to-understand guides for JAIIB, CAIIB, and UGC exams. My work includes breaking down notifications, admit cards, and exam updates, as well as preparing study plans and subject-wise strategies. My goal is to support working professionals in managing their exam preparation alongside a full-time job and to help them achieve career growth.","sameAs":["www.linkedin.com\/in\/aditi-chakraborty-131b3b379"]}]}},"_links":{"self":[{"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/posts\/228969","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/users\/58"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/comments?post=228969"}],"version-history":[{"count":1,"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/posts\/228969\/revisions"}],"predecessor-version":[{"id":228995,"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/posts\/228969\/revisions\/228995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/media\/229384"}],"wp:attachment":[{"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/media?parent=228969"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/categories?post=228969"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oliveboard.in\/blog\/wp-json\/wp\/v2\/tags?post=228969"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}