Strategic Railway Project Approvals: Zonal Perspective for Comprehensive Connectivity
In the context of railway development in India, projects like Janjatiya Gaurav Corridor are strategically sanctioned based on the Zonal Railway approach, rather than being confined to specific State, District, or Area boundaries. This approach is chosen due to the expansive nature of railway endeavors, which often span multiple regions, ensuring seamless integration of rail networks.
Janjatiya Gaurav Corridor: Sustained Efforts for Rail Growth
The approval of new railway lines, particularly in areas lacking existing connectivity, including the Janjatiya Gaurav Corridor, remains an ongoing and dynamic process within the broader framework of the Indian Railways.
Elevating Tribal Connectivity: The Janjatiya Gaurav Corridor
To accentuate rail infrastructure in regions with significant tribal populations, the concept of the “Janjatiya Gaurav Corridor” has emerged. This overarching initiative, budgeted at ₹70,000 Crore for the fiscal year 2023-24, is contingent on requisite Government approvals. Its fundamental goal is to enhance rail connectivity in tribal areas in the upcoming years.
Janjatiya Gaurav Corridor: Thorough Planning and Stakeholder Engagement
Projects falling under the ambit of the Janjatiya Gaurav Corridor, including those situated within the State of Odisha, undergo meticulous planning. This comprehensive process involves consultations with various stakeholders, such as State Governments, public representatives, organizations, rail users, and tribal communities. The Detailed Project Reports (DPRs) for these initiatives meticulously delineate parameters based on variables like traffic projections and socio-economic advantages.
Progress in Railway Surveys: Contributions from Odisha
In the past three years spanning FY 2020-21 to FY 2023-24, a total of 32 surveys, encompassing 19 new lines and 13 doubling projects, with a cumulative length of 1,467 km within the State of Odisha, have been successfully concluded. These surveys play a pivotal role in assessing feasibility and project viability.
Criteria Guiding Project Advancements
The advancement of new line projects, including those encompassed by the project, hinges on multiple criteria. Considerations such as economic viability, closing last-mile gaps, bridging missing links, exploring alternate routes, enhancing congested lines, and socio-economic factors are meticulously evaluated. Project progression also depends on ongoing commitments, funding availability, and competing demands.
A Continuous Journey of Project Approval
The process of sanctioning railway projects is a continuous and evolving one, adapting to emerging needs and priorities.
Ministerial Insights
The Minister of Railways, Communications, and Electronic & Information Technology, Shri Ashwini Vaishnaw, shared this information in response to a written inquiry in Lok Sabha.
This strategic approach to railway project approval underscores India’s dedication to achieving seamless connectivity and sustainable progress across its extensive rail network.
- IBPS RRB Clerk English Strategy 2025: Common Mistakes to Avoid
- RBI Grade B Officer Posting 2025, Locations, Career Growth & Training
- 100 SSC CGL 2025 Maths Questions Download PDF Tier-2
- SSC CGL Reasoning Questions with Solutions, Download Now
- SSC CGL Handwritten Notes by Toppers, Download Free PDF

Oliveboard Live Courses & Mock Test Series
- Download IRDAI Assistant Manager PYQs
- Monthly Current Affairs 2024
- Download RBI Grade B PYQ PDF
- Download IFSCA Grade A PYQs
- Download SEBI Grade A PYQs
- Attempt Free SSC CGL Mock Test 2024
- Attempt Free IBPS Mock Test 2024
- Attempt Free SSC CHSL Mock Test 2024
- Download Oliveboard App
- Follow Us on Google News for Latest Update
- Join Telegram Group for Latest Govt Jobs Update