In the question below, five sentences, labelled A, B, C, D and E, are given. They need to be arranged in a logical order to form a coherent paragraph/passage. From the given options, choose the most appropriate option.
(A) Located in the Columbia River Gorge National Scenic Area, Bonneville Dam was built for two reasons: to provide residents of the Pacific Northwest with electricity and to make the waterway more navigable for boat traffic.
(B) Now, the 1,954-kilometre river has been domesticated: Bridges seem to clamp down on the Columbia like yokes, and, more importantly, a series of dams and locks have chopped the once mighty Columbia into a series of placid reservoirs.
(C) The first major manmade change to the Columbia River occurred in 1938, with the completion of the Bonneville Dam.
(D) The Bonneville Dam is actually a series of several dams and links the states of Oregon and Washington.
(E) The Columbia River used to be a wild waterway full of frothing whitewater and robust salmon populations.
1.EBCDA
2.EDCBA
3.CADBE
4.CAEBD
5.EBACD
Correct Answer : 1
Solution :
Sentences E and B are pairs: E tells us about how the Columbia River used to be in the past, and B then tells us what it looks like in the present. Options b) and c) are eliminated.
Sentence C must follow the pair: EB, as B tells us about the changes that have been effected on the Columbia River, and C throws more light on one of these major changes. Thus, Options d) and e) are eliminated.
Thus, EBCDA is the correct order and Option a) is the right answer.
RBI Grade B Previous Year Papers
Attempt RBI Grade B Phase 1 PYPs, get detailed solutions
RBI Grade B Phase 1 Mock Test
Attempt RBI Grade B Phase 1 Mocks in Latest Pattern
Create a free Oliveboard account to access all PYQs with solutions & video explanations
RBI Phase I PYP Test Series
RBI Grade B Phase 1 PYP 2024 - 8th September Shift 1
2002002 Hours
RBI Grade B Phase 1 PYP 2024 - 8th September Shift 2
2002002 Hours
RBI Grade B Phase 1 PYP 2023 - 9th July Shift 1
2002002 Hours
RBI Grade B Phase 1 PYP 2023 - 9th July Shift 2
2002002 Hours
RBI Grade B Phase 1 PYP 2022 - 28th May Shift 1
2002002 Hours
RBI Grade B Phase 1 PYP 2022 - 28th May Shift 2
2002002 Hours
RBI Grade B Phase 1 PYP - 6th March Shift 1
2002002 Hours
RBI Grade B Phase 1 PYP - 6th March Shift 2
2002002 Hours
RBI Grade B Phase 1 PYP 2019 - 9th November Shift 1